This free concrete volume calculator works out how much concrete you need for slabs, footings, round pads, walls, columns, Sonotubes, fence-post holes and steps. Add as many pours as your project has, pick how much extra to allow, and get the total in cubic yards, cubic feet and cubic metres — plus the number of 40, 50, 60, 80 or 90 lb bags (or 20–40 kg bags) and how many ready-mix truck loads to order.

Last updated: November 14, 2026 · Runs in your browser — nothing you enter is sent anywhere.

1

Choose your units

Switching units keeps your sizes — the numbers convert automatically.

2

Pour 1: Slab, patio or driveway

L = 10 ftW = 10 ftT = 4 in
Diagram not to scale · formula: V = L × W × T
ft
in
ft
in
in

This pour: 33.33 ft³ (1.235 yd³) before extra

3

Extra for waste & spillage

%

5% for straight forms on a flat base, 10% for most home jobs, 15–20% for uneven ground or hand-dug holes.

Advanced: density, truck size & prices
Typical normal-weight concrete: 140–150 lb/ft³ (2,240–2,400 kg/m³).
Ask your supplier — full loads differ by truck and by local weight limits.
Concrete needed
1.36 yd³
36.7 ft³ · 1.04 m³ · includes 10% extra

Volume breakdown

yd³ft³m³
Exact volume1.2333.30.94
Extra (10%)0.123.30.09
Total1.3636.71.04

Approx. weight: 5,494 lb (2.75 US tons)

Bags of premixed concrete

123× 40 lb
98× 50 lb
82× 60 lb
62× 80 lb
55× 90 lb

Other sizes: 111 × 20 kg · 89 × 25 kg · 74 × 30 kg · 56 × 40 kg

Yields from the QUIKRETE Concrete Mix data sheet (80 lb ≈ 0.60 ft³). Bags are rounded up.

Ordering ready-mix

Order (rounded up to 0.25 yd³)1.5 yd³
Truck loads at 10 yd³ each1

More than 1 cubic yard (62 × 80 lb bags). Mixing this by hand is heavy work — get a ready-mix quote and compare.

Mixing from scratch? Cement, sand & gravel
Cement8 × 94 lb bags (725 lb)
Sand16.1 ft³ (0.6 yd³)
Gravel / stone32.3 ft³ (1.2 yd³)

Nominal site-mix rule of thumb (dry volume × 1.54). For structural work use the mix your engineer or local code specifies.

  • Slabs, footings & tubes
  • Cubic yards & ready-mix
  • 60-lb and 80-lb bags
  • Waste buffer allowance

100% free · No sign-up · Runs in your browser, nothing is uploaded

How to use this concrete calculator

  1. Pick your units. Use feet and inches or metres and centimetres. Switching later converts the sizes you have already typed.
  2. Choose a shape for each pour and fill in the sizes shown on its diagram. Most jobs have more than one part — a patio plus its footing, or a deck with eight post holes — so press Add another pour for each part.
  3. Set the extra for waste. 10% is a sensible default. The total, bag counts and truck loads update as you type.
  4. Decide how to buy. Compare the bag count with the ready-mix order, add your local prices if you want a cost, then copy, print or share the result.

Concrete volume formulas for every shape

Every concrete estimate starts with the same idea: volume = area × thickness. The shape only changes how you get the area. Convert every measurement to the same unit first — feet for a result in cubic feet, metres for cubic metres — and divide cubic feet by 27 to get cubic yards.

LWT

Slab, patio or driveway

V = L × W × T

Patios, driveways, shed bases and garage floors. Enter the inside size of the forms and the finished thickness.

ground levelLWD

Footing or trench

V = L × W × D

Strip footings and trenches under walls. Width and depth are usually set by your plans or local code.

DT

Round slab or pad

V = π × (D ÷ 2)² × T

Round pads for fire pits, hot tubs or planters. Measure straight across the centre for the diameter.

LHT

Wall

V = L × H × T

Poured walls and kerbs. Use the thickness between the inside faces of the wall forms.

WDH

Square column or pier

V = W × D × H

Square piers and columns. Measure the inside of the form, not the finished cladding.

DH

Round column or Sonotube

V = π × (D ÷ 2)² × H

Sonotubes and round piers for decks and porches. Use the tube’s inside diameter.

ground levelDHPconcrete

Fence or deck post holes

V = π × (D ÷ 2)² × H − post × H

Fence and deck posts set in concrete. The calculator subtracts the post so you don’t over-buy.

RTWN steps

Steps or stairs

V = W × R × T × N × (N + 1) ÷ 2

Solid steps poured on the ground. Each step is a block that sits on the one below, so volume grows with every step.

For round shapes, π is about 3.1416 and the radius is half the diameter. For post holes, the calculator works out the volume of the hole and takes away the part of the post that sits below ground (P × P × H for a square post). For solid steps, the bottom step is one rise tall, the next is two rises tall and so on, which is where N × (N + 1) ÷ 2 comes from.

Measure inside the forms

L (inside)W (inside)form boards (do not include their thickness)
Length and width are the inside faces of the form boards.

Concrete fills the space between your form boards, so measure from the inside face of one board to the inside face of the opposite board. Measuring the outside adds the thickness of two boards to each side and can push a small slab’s estimate up by several percent.

Check the depth in a few places too. A base that dips by half an inch over a 12 × 12 ft patio adds about 6 cubic feet of concrete — roughly ten 80 lb bags — which is why a waste allowance matters.

Worked examples

All examples use 10% extra for waste unless stated. They are calculated with the same code that runs the tool above.

10 × 10 ft patio, 4 in thick

Slab · imperial

  • Volume: 33.3 ft³ = 1.23 yd³
  • With 10%: 1.36 yd³
  • Bags: 62 × 80 lb or 82 × 60 lb
  • Ready-mix: order 1.5 yd³

20 ft footing, 16 in wide, 8 in deep

Footing · imperial

  • Volume: 17.8 ft³ = 0.66 yd³
  • With 10%: 0.72 yd³
  • Bags: 33 × 80 lb

8 fence posts (4×4) in 10 × 24 in holes

Post holes · post subtracted

  • Volume: 7.37 ft³
  • With 10%: 8.1 ft³
  • Bags: 14 × 80 lb or 22 × 50 lb

4 Sonotubes, 12 in × 4 ft

Round columns · deck footings

  • Volume: 12.57 ft³
  • With 10%: 13.82 ft³
  • Bags: 24 × 80 lb

3 solid steps, 4 ft wide

7 in rise · 11 in run

  • Volume: 12.83 ft³
  • With 10%: 14.12 ft³
  • Bags: 24 × 80 lb

4 × 3 m slab, 10 cm thick

Slab · metric

  • Volume: 1.2 m³
  • With 10%: 1.32 m³
  • Bags: 113 × 25 kg (estimated yield)
  • Ready-mix: order 1.5 m³

Combining pours: a 12 × 12 ft, 4 in patio plus four 10 × 30 in post holes for 6×6 pergola posts comes to 2.09 yd³ with 10% extra (95 × 80 lb bags). Add both parts in the calculator instead of running two separate estimates.

How many bags of concrete are in a yard?

Bagged concrete is sold by weight, but what you need is volume. The US yields below come from the QUIKRETE Concrete Mix data sheet. Metric bag yields are estimated with the same yield per kilogram, so check the label on the bag you buy. Counts are rounded up to whole bags and do not include extra for waste.

Bag sizeYield per bagBags per cubic yardBags per cubic metre
40 lb0.3 ft³ · 8.5 L90118
50 lb0.375 ft³ · 10.6 L7295
60 lb0.45 ft³ · 12.7 L6079
80 lb0.6 ft³ · 17 L4559
90 lb0.675 ft³ · 19.1 L4053
20 kg (estimated)0.331 ft³ · 9.4 L82107
25 kg (estimated)0.413 ft³ · 11.7 L6686
30 kg (estimated)0.496 ft³ · 14 L5572
40 kg (estimated)0.661 ft³ · 18.7 L4154

Cubic yards for common slab sizes

Exact volumes with no waste added. Multiply by 1.10 for 10% extra, or let the calculator do it. The bag column assumes 80 lb bags.

Slab size4 in thick80 lb bags (4 in)6 in thick80 lb bags (6 in)
10 × 10 ft1.23 yd³561.85 yd³84
10 × 12 ft1.48 yd³672.22 yd³100
12 × 12 ft1.78 yd³802.67 yd³120
12 × 20 ft2.96 yd³1344.44 yd³200
20 × 20 ft4.94 yd³2237.41 yd³334
24 × 24 ft7.11 yd³32010.67 yd³480

How thick should a concrete slab be?

Thickness has the biggest effect on volume: going from 4 to 6 inches adds 50% more concrete. These are common starting points for residential work. Your plans, soil and local building code have the final say, especially for footings and anything that carries a structure.

ProjectTypical thicknessNotes
Walkway, patio, shed base4 in (10 cm)On a compacted gravel base
Driveway (cars)4–5 in (10–13 cm)Thicker at edges and where water collects
Driveway or pad for heavier vehicles6 in (15 cm)RVs, trucks, trailers
Garage floor4–6 in (10–15 cm)Check local code
Footings, foundation wallsAs specifiedSet by plans and building code

Bags or ready-mix: which should you buy?

The calculator shows both so you can compare. For small jobs, bags win: you can buy exactly what you need, mix in a wheelbarrow or small mixer, and work at your own pace. A cubic yard of bagged mix is 45 bags of 80 lb — roughly 3,600 lb to lift, carry and mix — so check your vehicle’s payload rating before you load it all at once.

Past about a cubic yard, ready-mix is usually easier. The concrete arrives mixed and is placed in one go, which avoids joints between batches. Suppliers sell by the cubic yard or cubic metre and often in steps such as a quarter yard, which is why the calculator rounds the order up. Many charge extra for small loads, so ask about minimum orders, delivery and pump charges when you get a quote.

How much extra concrete to order

  • 5% — straight, rigid forms on a flat, compacted base.
  • 10% — most home slabs, footings and steps. This is the calculator’s default.
  • 15–20% — uneven ground, hand-dug post holes, curved forms or your first pour.

Running short is worse than having a little left over. If a pour stops halfway, the first part starts to harden before the rest arrives, leaving a weak seam. Leftover bags keep for later repairs if you store them dry.

Common mistakes

  • Mixing inches and feet. A 4-inch slab is 0.333 ft thick, not 4 ft. Entering thickness in the inches box avoids this.
  • Measuring the outside of the forms. Always use the inside faces.
  • Forgetting the extra parts. Thickened slab edges, footings and post holes are often left out — add them as separate pours.
  • Rounding bags down. 61.1 bags means buying 62. The calculator always rounds up.
  • Ignoring the post in a post hole. A 6×6 post in a 12-inch hole takes up about a quarter of the space.

Mixing concrete from cement, sand and gravel

If you mix your own instead of buying premixed bags, open the Mixing from scratch panel in the results. It splits the total into cement, sand and gravel for a chosen ratio such as 1 : 2 : 4, using the common site rule that loose dry materials take about 54% more space than the finished concrete. These are nominal mixes for general work; anything structural should use the mix your engineer or local code specifies.

Frequently asked questions

How many 80 lb bags of concrete are in a cubic yard?

An 80 lb bag yields about 0.60 cubic feet, and a cubic yard is 27 cubic feet, so one cubic yard takes 45 bags of 80 lb mix. Add 10% for waste and buy 50. The same yard takes 60 bags of 60 lb mix or 90 bags of 40 lb mix.

How do you figure concrete in yards?

Multiply length in feet by width in feet by thickness in feet (inches ÷ 12) to get cubic feet, then divide by 27. A 10 × 10 ft slab 4 inches thick is 10 × 10 × 0.333 = 33.3 cubic feet, and 33.3 ÷ 27 = 1.23 cubic yards before any extra.

How much concrete do I need for a 10×10 slab that is 4 inches thick?

33.3 cubic feet, or 1.23 cubic yards. With 10% extra that becomes 1.36 cubic yards: 62 bags of 80 lb mix, 82 bags of 60 lb mix, or a ready-mix order of 1.5 cubic yards.

How much extra concrete should I order?

Add 5% when the forms are straight and the base is flat and compacted, 10% for most home projects, and 15–20% when the ground is uneven or the holes are dug by hand. Running short in the middle of a pour causes a weak cold joint, so a few spare bags are cheap insurance.

How many bags of concrete do I need for a fence post?

A 10-inch-wide, 24-inch-deep hole around a 4×4 post holds about 0.92 cubic feet of concrete. That is 2 bags of 80 lb mix or 3 bags of 50 lb mix per post. Bigger holes or longer posts need more — use the post-hole shape in the calculator, which subtracts the space the post takes up.

How many yards of concrete are in a cement truck?

There is no single size. Many standard mixer trucks carry roughly 8 to 10 cubic yards per load, smaller trucks carry less, and local road weight limits can reduce a full load. Ask your supplier for their load size and enter it in the calculator’s advanced settings to get the number of truck loads.

Should I use bagged concrete or order ready-mix?

As a rule of thumb, bags make sense up to about one cubic yard (45 × 80 lb bags) — fence posts, small pads, steps and repairs. Above that, mixing by hand gets slow and the first batches can start to set before the last ones are placed, so get a ready-mix quote. Ask about minimum orders and short-load fees.

How thick should a concrete slab be?

Patios, walkways and shed bases are commonly poured 4 inches (10 cm) thick. Driveways for cars are often 4–5 inches and 6 inches where heavier vehicles park. Footings and structural slabs should follow your plans and local building code.

Is concrete the same as cement?

No. Cement is the fine grey powder that acts as the glue. Concrete is the finished material: cement mixed with sand, gravel or crushed stone, and water. A bag labelled “concrete mix” already contains all the dry ingredients — you only add water.

How many cubic yards are in a cubic metre?

One cubic metre equals about 1.31 cubic yards, and one cubic yard equals about 0.76 cubic metres (27 cubic feet). The calculator shows yd³, ft³ and m³ side by side, so you can order in whichever unit your supplier uses.

How much water goes in an 80 lb bag of concrete?

The QUIKRETE data sheet for its Concrete Mix suggests starting with about 6 pints (2.8 litres) of water per 80 lb bag and not going past about 9 pints (4.3 litres). Too much water makes the mix easier to pour but weaker once it cures.

Does the calculator include rebar or wire mesh?

No. Rebar and mesh take up very little of the slab’s volume, so the concrete estimate stays the same. Plan reinforcement, forms, gravel base and labour separately.

Related calculators

Sources and how we calculate

  • Bag yields (40 lb 0.30 ft³, 50 lb 0.375 ft³, 60 lb 0.45 ft³, 80 lb 0.60 ft³, 90 lb 0.675 ft³), mixing water and curing guidance: QUIKRETE Concrete Mix No. 1101 data sheet (revised October 2022). The same sheet lists a unit weight of about 140 lb/ft³ for that mix.
  • Metric bag yields are not from a manufacturer: they apply the same yield per kilogram (≈ 0.47 L of concrete per kg of dry mix). Use your bag’s printed yield if it differs.
  • Weight uses 150 lb/ft³ (2,400 kg/m³) by default, a common figure for normal-weight concrete; change it in the advanced settings.
  • Conversions: 1 yd³ = 27 ft³ = 0.7646 m³; 1 ft = 0.3048 m; 1 in = 2.54 cm.
  • Results are planning estimates. They do not replace engineering design, local building code or your supplier’s advice.
💡Suggest a Tool